@inproceedings{cc82a820733c4cb39ff36ff5adfd79ee,
title = "Vera C. Rubin Observatory system integration, test, and commissioning: Strategy and status",
abstract = "The Vera C. Rubin Observatory is a joint NSF and DOE construction project with facilities distributed across multiple sites. These sites include the Summit Facility on Cerro Pach{\'o}n, Chile; the Base Facility in La Serena, Chile; the Project and Operations Center in Tucson, AZ; the Camera integration and testing laboratories at SLAC National Accelerator Laboratory in Menlo Park, CA; and the data support center based at the National Center for SuperComputing Applications at Urbana-Champaign, IL. The Rubin Observatory construction Project has entered its system integration and testing phase where major subsystem components are coming together and being tested and verified at a system level for the first time. The system integration phase of the Project requires a closely coordinated and organized plan to merge, manage, and be able to adapt the complex set of subsystems and activities across the entire observatory as real effects are discovered. In this paper we present our strategy to successfully complete integration, test and commissioning of the systems making up the Rubin Observatory. We include discussion on (i) our strategy for integration activities and the verification of requirements (ii) a brief summary of construction status at the time of this paper, (iii) early integration activities that are used to mitigate risks including the use of the Rubin Observatory's commissioning camera (ComCam), planning for the integration, testing and verification of the primary science instrument - LSSTCam, and lastly, (v) Science Verification through short concentrated survey-like campaigns. Throughout this paper we identify where key performance metrics are addressed that directly impact the Rubin Observatory's 10\{year Legacy Survey of Space and Time (LSST) science capabilities - e.g. image quality, telescope dynamics, alert latency, etc.",
keywords = "Commissioning, Performance, Planning, Rubin Observatory, System Integration, Verification",
author = "Jacques Sebag and Claver, \{Charles F.\} and Thomas, \{Sandrine J.\} and Kevin Reil and Jeffrey Barr and Keith Bechtol and Felipe Daruich and Juan Fabrega and Guy, \{Leanne P.\} and Patrick Ingraham and Victor Krabbendam and Margaux Lopez and Freddy Munoz and Doug Neill and Wil O'Mullane and Michael Reuter and Austin Roberts and Tiago Ribeiro and Eduardo Serrano and Cristian Silva and Brian Stalder and Roberto Tighe and Bo Xin",
note = "Publisher Copyright: {\textcopyright} COPYRIGHT SPIE. Downloading of the abstract is permitted for personal use only.; Ground-Based and Airborne Telescopes VIII 2020 ; Conference date: 14-12-2020 Through 22-12-2020",
year = "2020",
doi = "10.1117/12.2561675",
language = "English (US)",
series = "Proceedings of SPIE - The International Society for Optical Engineering",
publisher = "SPIE",
editor = "Marshall, \{Heather K.\} and Jason Spyromilio and Tomonori Usuda",
booktitle = "Ground-Based and Airborne Telescopes VIII",
}