Skip to main navigation Skip to search Skip to main content

Vera C. Rubin Observatory system integration, test, and commissioning: Strategy and status

  • Jacques Sebag
  • , Charles F. Claver
  • , Sandrine J. Thomas
  • , Kevin Reil
  • , Jeffrey Barr
  • , Keith Bechtol
  • , Felipe Daruich
  • , Juan Fabrega
  • , Leanne P. Guy
  • , Patrick Ingraham
  • , Victor Krabbendam
  • , Margaux Lopez
  • , Freddy Munoz
  • , Doug Neill
  • , Wil O'Mullane
  • , Michael Reuter
  • , Austin Roberts
  • , Tiago Ribeiro
  • , Eduardo Serrano
  • , Cristian Silva
  • Brian Stalder, Roberto Tighe, Bo Xin

Research output: Chapter in Book/Report/Conference proceeding › Conference contribution

Abstract

The Vera C. Rubin Observatory is a joint NSF and DOE construction project with facilities distributed across multiple sites. These sites include the Summit Facility on Cerro Pachón, Chile; the Base Facility in La Serena, Chile; the Project and Operations Center in Tucson, AZ; the Camera integration and testing laboratories at SLAC National Accelerator Laboratory in Menlo Park, CA; and the data support center based at the National Center for SuperComputing Applications at Urbana-Champaign, IL. The Rubin Observatory construction Project has entered its system integration and testing phase where major subsystem components are coming together and being tested and verified at a system level for the first time. The system integration phase of the Project requires a closely coordinated and organized plan to merge, manage, and be able to adapt the complex set of subsystems and activities across the entire observatory as real effects are discovered. In this paper we present our strategy to successfully complete integration, test and commissioning of the systems making up the Rubin Observatory. We include discussion on (i) our strategy for integration activities and the verification of requirements (ii) a brief summary of construction status at the time of this paper, (iii) early integration activities that are used to mitigate risks including the use of the Rubin Observatory's commissioning camera (ComCam), planning for the integration, testing and verification of the primary science instrument - LSSTCam, and lastly, (v) Science Verification through short concentrated survey-like campaigns. Throughout this paper we identify where key performance metrics are addressed that directly impact the Rubin Observatory's 10{year Legacy Survey of Space and Time (LSST) science capabilities - e.g. image quality, telescope dynamics, alert latency, etc.

Original languageEnglish (US)
Title of host publicationGround-Based and Airborne Telescopes VIII
EditorsHeather K. Marshall, Jason Spyromilio, Tomonori Usuda
PublisherSPIE
ISBN (Electronic)9781510636774
DOIs
StatePublished - 2020
Externally publishedYes
EventGround-Based and Airborne Telescopes VIII 2020 - Virtual, Online, United States
Duration: Dec 14 2020 → Dec 22 2020

Publication series

NameProceedings of SPIE - The International Society for Optical Engineering
Volume11445
ISSN (Print)0277-786X
ISSN (Electronic)1996-756X

Conference

ConferenceGround-Based and Airborne Telescopes VIII 2020
Country/TerritoryUnited States
CityVirtual, Online
Period12/14/20 → 12/22/20

Keywords

  • Commissioning
  • Performance
  • Planning
  • Rubin Observatory
  • System Integration
  • Verification

ASJC Scopus subject areas

  • Electronic, Optical and Magnetic Materials
  • Instrumentation
  • Condensed Matter Physics
  • Computer Science Applications
  • Applied Mathematics
  • Electrical and Electronic Engineering

Fingerprint

Dive into the research topics of 'Vera C. Rubin Observatory system integration, test, and commissioning: Strategy and status'. Together they form a unique fingerprint.

Cite this