The Giant Magellan Telescope Project is in the construction phase. Production of the primary mirror segments is underway with four of the seven required 8.4m mirrors at various stages of completion and materials purchased for segments five and six. Development of the infrastructure at the GMT site at Las Campanas is nearing completion. Power, water and data connections sufficient to support the construction of the telescope and enclosure are in place and roads to the summit have been widened and graded to support transportation of large and heavy loads. Construction pads for the support buildings have been graded and the construction residence is being installed. A small number of issues need to be resolved before the final design of the telescope structure and enclosure can proceed and the GMT team is collecting the required inputs to the decision making process. Prototyping activities targeted at the active and adaptive optics systems are allowing us to finalize designs before large scale production of components begins. Our technically driven schedule calls for the telescope to be assembled on site in 2022 and to be ready to receive a subset of the primary and secondary mirror optics late in the year. The end date for the project is coupled to the delivery of the final primary mirror segments and the adaptive secondary mirrors that support adaptive optics operations.

Original languageEnglish (US)
Title of host publicationGround-Based and Airborne Telescopes VI
EditorsHeather K. Marshall, Helen J. Hall, Roberto Gilmozzi
PublisherSPIE
ISBN (Electronic)9781510601918
DOIs
StatePublished - 2016
Externally publishedYes
EventGround-Based and Airborne Telescopes VI - Edinburgh, United Kingdom
Duration: Jun 26 2016Jul 1 2016

Publication series

NameProceedings of SPIE - The International Society for Optical Engineering
Volume9906
ISSN (Print)0277-786X
ISSN (Electronic)1996-756X

Other

OtherGround-Based and Airborne Telescopes VI
Country/TerritoryUnited Kingdom
CityEdinburgh
Period6/26/167/1/16

Keywords

  • Extremely large telescope
  • GMT
  • GMTO
  • Giant magellan telescope
  • Overview

ASJC Scopus subject areas

  • Electronic, Optical and Magnetic Materials
  • Condensed Matter Physics
  • Computer Science Applications
  • Applied Mathematics
  • Electrical and Electronic Engineering

Fingerprint

Dive into the research topics of 'Overview and status of the giant magellan telescope project'. Together they form a unique fingerprint.

Cite this