Abstract
The integration of large-scale uncertain and uncontrollable wind and solar power generation has brought new challenges to the operations of modern power systems. In a power system with abundant water resources, hydroelectric generation with high operational flexibility is a powerful tool to promote a higher penetration of wind and solar power generation. In this paper, we study the day-ahead scheduling of a thermal-hydro-wind-solar power system. The uncertainties of renewable energy generation, including uncertain natural water inflow and wind/solar power output, are taken into consideration. We explore how the operational flexibility of hydroelectric generation and the coordination of thermal-hydro power can be utilized to hedge against uncertain wind/solar power under a multistage robust optimization (MRO) framework. To address the computational issue, mixed decision rules are employed to reformulate the original MRO model with a multi-level structure into a bi-level one. Column-and-constraint generation (C &CG) algorithm is extended into the MRO case to solve the bi-level model. The proposed optimization approach is tested in three real-world cases. The computational results demonstrate the capability of hydroelectric generation to promote the accommodation of uncertain wind and solar power.
Original language | English (US) |
---|---|
Pages (from-to) | 999-1034 |
Number of pages | 36 |
Journal | Journal of Global Optimization |
Volume | 88 |
Issue number | 4 |
DOIs | |
State | Published - Apr 2024 |
Externally published | Yes |
Keywords
- Day-ahead scheduling
- Hybrid power system
- Multistage robust optimization
- Renewable energy
ASJC Scopus subject areas
- Business, Management and Accounting (miscellaneous)
- Computer Science Applications
- Control and Optimization
- Management Science and Operations Research
- Applied Mathematics