Abstract
Ignoring changing duty cycles result in equipment mismatch which increases operating cost and misallocation of resources. The objective of this study is to investigate the effect of changing duty cycles on the optimal shuttle car fleet size used to mine a particular panel width. A room and pillar mining system is modelled using discrete event simulation and validated using data from a real mine. Experimental analysis is conducted to evaluate the effect of ignoring changing duty cycle in a 17-entry coal panel. Changing duty cycle is accounted for by determining the optimal fleet size in defined segments within the panel. The study shows that, for the 17-entry panel studied, a fleet of four shuttle cars is optimal for the entire panel when changing duty cycle is not accounted. However, by accounting for changing duty cycle, a fleet size of four is only optimal for 80% of the defined segments.
| Original language | English (US) |
|---|---|
| Pages (from-to) | 96-112 |
| Number of pages | 17 |
| Journal | International Journal of Mining and Mineral Engineering |
| Volume | 8 |
| Issue number | 2 |
| DOIs | |
| State | Published - 2017 |
| Externally published | Yes |
Keywords
- Discrete event simulation
- Duty cycle
- Fleet size
- Optimisation
- Room and pillar mining
- Shuttle car-continuous miner matching
ASJC Scopus subject areas
- Geotechnical Engineering and Engineering Geology
- Industrial and Manufacturing Engineering
Fingerprint
Dive into the research topics of 'Incorporating changing duty cycles in CM-shuttle car matching using discrete event simulation: A case study'. Together they form a unique fingerprint.Cite this
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS