TY - JOUR
T1 - Correction
T2 - AIAA AVIATION FORUM AND ASCEND, 2025
AU - Mukherjee, Rudranaryan
AU - Dickinson, Cameron
AU - Thangavelautham, Jekan
N1 - Publisher Copyright:
© 2025, American Institute of Aeronautics and Astronautics Inc, AIAA. All rights reserved.
PY - 2025
Y1 - 2025
N2 - 1. Note the author list is updated to the following: Cameron Dickinson (1), Justin Kugler (2), Fu Nan Shi (3), Tate Del Rizzo (4), Rudranarayan Mukherjee (5), Jekan Thangavelautham (6) 2. The author affiliation is the following: MDA Space, Houston, Texas, 77058, USA (1), Intuitive Machines, Houston Texas, 77058, USA (2), University of Toronto, Toronto Ontario, M3H 5T6, Canada (3), Queen’s University, Kingston Ontario, K7L 3N6, Canada (4), Jet Propulsion Laboratory, Pasadena, California, 91109, USA (5), University of Arizona, Tucson, Arizona, 85721, USA (6). 3. In Section IV, under subsection “IM 1 Lander”, the sixth sentence should be corrected to the following: In previous missions, NOVA-C landers have arrived on the lunar surface carrying a variety of payloads including mobile platforms designed to explore the lunar surface such as the Mobile Autonomous Prospecting Platform, SPACEBIT Rover, and μNova, although these systems did not successfully deploy due to unplanned tipping of the lander and off-nominal touchdown respectively for the IM-1 and IM-2 missions [5, 6].
AB - 1. Note the author list is updated to the following: Cameron Dickinson (1), Justin Kugler (2), Fu Nan Shi (3), Tate Del Rizzo (4), Rudranarayan Mukherjee (5), Jekan Thangavelautham (6) 2. The author affiliation is the following: MDA Space, Houston, Texas, 77058, USA (1), Intuitive Machines, Houston Texas, 77058, USA (2), University of Toronto, Toronto Ontario, M3H 5T6, Canada (3), Queen’s University, Kingston Ontario, K7L 3N6, Canada (4), Jet Propulsion Laboratory, Pasadena, California, 91109, USA (5), University of Arizona, Tucson, Arizona, 85721, USA (6). 3. In Section IV, under subsection “IM 1 Lander”, the sixth sentence should be corrected to the following: In previous missions, NOVA-C landers have arrived on the lunar surface carrying a variety of payloads including mobile platforms designed to explore the lunar surface such as the Mobile Autonomous Prospecting Platform, SPACEBIT Rover, and μNova, although these systems did not successfully deploy due to unplanned tipping of the lander and off-nominal touchdown respectively for the IM-1 and IM-2 missions [5, 6].
UR - https://www.scopus.com/pages/publications/105018191638
UR - https://www.scopus.com/pages/publications/105018191638#tab=citedBy
U2 - 10.2514/6.2025-4135.c1
DO - 10.2514/6.2025-4135.c1
M3 - Comment/debate
AN - SCOPUS:105018191638
JO - AIAA Aviation Forum and ASCEND, 2025
JF - AIAA Aviation Forum and ASCEND, 2025
Y2 - 21 July 2025 through 25 July 2025
ER -
Duration: Jul 21 2025 → Jul 25 2025